A construction hoist mast needs to work together with the structure supporting it. That is why tie-in design is part of installation planning, before manufacturing and assembly begin.
In Rack’s technical publication, tie-ins are selected for each specific application. The design accounts for the distance between the mast and the building, along with the forces acting on the connection, to determine a suitable solution.
When a building’s geometry calls for a special solution, the engineering team evaluates those conditions. The resulting design connects the requirements of the jobsite with the sizing of the components.
Before specifying a construction hoist for your project, learn how Rack’s engineering team evaluates the installation. For manufacturing facilities, explore our industrial rack and pinion elevators.

